CONSTRUCTION OF RISK ASSESSMENT MODEL FOR CHARACTERISTIC TOWN PPP PROJECT IN THE OPERATION STAGE BASED ON IMPROVED MATTER ELEMENT MODEL--FROM THE PERSPECTIVE OF SOCIAL CAPITAL

Authors:
WU yulu and YAO hui

|| ||

WU yulu and YAO hui
junior students majoring in accounting, Nanjing Normal University, China

MLA 8
yulu, WU, and YAO hui. "CONSTRUCTION OF RISK ASSESSMENT MODEL FOR CHARACTERISTIC TOWN PPP PROJECT IN THE OPERATION STAGE BASED ON IMPROVED MATTER ELEMENT MODEL--FROM THE PERSPECTIVE OF SOCIAL CAPITAL." Int. j. of Social Science and Economic Research, vol. 6, no. 3, Mar. 2021, pp. 883-893, doi:10.46609/IJSSER.2021.v06i03.010. Accessed Mar. 2021.
APA 6
yulu, W., & hui, Y. (2021, March). CONSTRUCTION OF RISK ASSESSMENT MODEL FOR CHARACTERISTIC TOWN PPP PROJECT IN THE OPERATION STAGE BASED ON IMPROVED MATTER ELEMENT MODEL--FROM THE PERSPECTIVE OF SOCIAL CAPITAL. Int. j. of Social Science and Economic Research, 6(3), 883-893. doi:10.46609/IJSSER.2021.v06i03.010
Chicago
yulu, WU, and YAO hui. "CONSTRUCTION OF RISK ASSESSMENT MODEL FOR CHARACTERISTIC TOWN PPP PROJECT IN THE OPERATION STAGE BASED ON IMPROVED MATTER ELEMENT MODEL--FROM THE PERSPECTIVE OF SOCIAL CAPITAL." Int. j. of Social Science and Economic Research 6, no. 3 (March 2021), 883-893. Accessed March, 2021. doi:10.46609/IJSSER.2021.v06i03.010.

References
[1]. Chen Shuling. PPP Model Featured Town Risk Management - Take the Special Town of Zhile Fisheries as an Example of the Value Project, 2019, 38 (29): 95-97.
[2]. Liu Bo, ShenJuqin, Sun Fuhua. PPP Model Reducing the Operation Mode of Water Engineering Projects Selection Study. China Rural Water and Hydropower, 2017 (12): 140-144.
[3]. Jiao Wei, Fu Weihui, ShenZhifeng. Dynamic Analysis of PPP Project Stakeholder Relationship Network from a Full Life Cycle Perspective, Project Management Technology, 2016, 14 (08): 32-37.
[4]. Li Haizhu, Deng Ruixiang, Wang Sejong, Li Manchu, Ding Longting. DB pattern indicator weights based on interval value hesitant fuzzy entropy are determined. Journal of Civil Engineering and Management, 2019, 36 (05): 96-101.
[5]. ZengXue, Koo Peng. Highway PPP Project Risk Evaluation Model Construction and Application - Based on Social Capital Perspectives, Residential and Real Estate, 2019 (06): 120-121.
[6]. Cheng Daohu. Study on the risk evaluation of the DB model of highway engineering based on the interval value hesitant fuzzy entropy-cloud model, Highway, 2020, 65 (11): 278-284.
[7]. Cui Caiyun, Liu Yong, Xia Bo, et al. Overview of public-private partnerships in the waste-to-energy incineration industry in China: Status, opportunities, and challenges. 2020, :100584-.

Abstract:
The application of PPP mode in characteristic town projects has become a hot trend in the development of characteristic towns, which is conducive to the formation of reasonable market competition and scientific allocation of social resources. However, at present, PPP mode makes it face more complicated risk environment than general project projects in the operation stage, and social capital is in a relatively inferior position. From the perspective of social capital, this paper uses decomposition analysis method to identify the risk factors of PPP characteristic town project operation stage, improves the weight judgment in matter-element model by interval hesitant fuzzy entropy, and constructs risk assessment model.